Teri's House is here to help those who are unable to help themselves. With the helping hands of Teri's house, we pride ourselves on our patient and compassionate approach to helping those afflicted with down syndrome.
We ask that Donations be made out and sent directly to:
Teri's House
74 Pleasant Plains Ave.
Staten Island, NY 10309
*With any donation you make, the returned check will serve as your receipt for income tax.
Architect Lenny Rampulla's rendering of the New House
An itemized list of what is to be built taken from the contractor agreement made between:
Down Syndrome Foundation 70 Pleasant Plains, Staten Island
Trades Construction
Alan Becker
Temporary fencing and garbage removal $10.0k
Excavation, dry well, storm sewer, yard & zipper drain 30.0k
Footings, foundation, retaining walls & ramp, materials 120 yards 13.2k
Optional rebar $ 5.6K
Footings, foundation, retaining walls & ramp, materials 120 yards/Labor 120 yards 19.2k
Metal Framing Labor 5200 sf x $15 78.0k
Optional wood framing labor $52.0k
Framing materials light gauge steel 5200 sf x $45 234.9k
Structural C Joints, Studs, Runners, bracing, Bridging & related accessories
Sub flooring, exterior waterproof sheathing
Optional wood framing materials $98.8K
Roofing materials 20 squares @ $140 2.8k
Roofing labor 20 squares @ $180 3.6k
Aluminum siding, soffits facia & gutter materials 38 sq 6.1k
Aluminum siding, soffits facia & gutter labor 38sq 9.5k
Entrance rear & two side doors 6.0k
40 pella windows @ $350 14.0k
5/8 Sheetrock & taping materials 600 boards @ $12 7.2k
Sheetrock & Taping Labor @ $24 per board 14.4k
Prime & Paint Materials 80 gals @ $22 gallon 1.8k
Prime & Paint Materials Labor 600 boards 7.2k
Interior trim materials (2 1/2 castings + 3 1/2 molding)
Solid wood doors, pocket doors with hardware 6.5k
Interior trim labor (2 1/2 castings + 3 1/2 molding)
Solid wood doors, pocket doors with hardware 7.5k
Hard Wood flooring materials 2400 sf @ $3 7.2k
Hard Wood flooring install sand poly 2400 sf@ $4 9.6k
Plumbing 30 fixtures, waste, water & gas 30.0k
House trap & stacks 5.0k
15 10k BTU AC window units with sleeves 10.5k
Optional Central AC and duct work $22.0k
Electric 200 amp service, interior & exterior light 189 points@$175 31.5k
National grid gas service from the street 3.5k
Sewer connection & water connection from the street 16.0k
Steel work & steel exterior stairs material 10.0k
Steel work & steel exterior stairs Labor 24.0k
Kitchen & kitchenette materials 35.0k
Kitchen & kitchenette Labor 18.0k
Bathroom materials fixtures, tile, accessories 9.8k
Bathroom Labor tile, accessories, custom showers 10.6k
Landscaping, decorative wall & asphalt parking pads 18.0k
Sidewalk & curb repair 8.0k
Sprinkler system & dbl check value materials 16.0k
Sprinkler system & dbl check value labor 24.0k
Elevator 50.0k
General contractor staff & office 48.0k
Total $855.7k
Optional in ground well 11.0k
Optional generator 5.0k